Your rights

Signing for a heating job: contracts, cancelling and your rights

What you sign for a boiler or heating job decides what you can insist on later. This article sets out what the written quote and contract should say, how cancelling works for contracts made at home or online, and the rights you keep whatever the paperwork says.

Last reviewed · facts read at source on 3 November 2026 · published by SEO-DONS LTD · sources

Before you sign

What the written quote and contract should say

A heating contract need not be long, but it does need to be specific. Collect at least three quotes, as the Energy Saving Trust advises; the one you accept should leave no doubt about what you are paying for. Look for:

  • the boiler's make, model and output, and how the size was worked out;
  • everything else included: controls, radiator valves, cleaning and inhibitor, the flue route, the condensate pipe and a carbon monoxide alarm;
  • the total price with VAT shown, and when each payment falls due;
  • a start date, and how long the work should take;
  • who will do the gas work, and their Gas Safe registration number;
  • the paperwork you will receive, including the completed Benchmark commissioning checklist and the Building Regulations compliance certificate;
  • your cancellation rights, and how to use them.

Comparing heating quotes shows how to read several quotes side by side before you choose one.

What counts

What the firm says becomes part of the deal

Section 50 of the Consumer Rights Act 2015 makes what a trader says or writes about a service a term of the contract, as long as you took it into account. A promise made in your kitchen or in an email, for instance that the system will be power flushed or that a magnetic filter is included, can count as much as the printed quote. Keep the emails, messages and leaflets, and note down anything important that was said.

Two further sections fill gaps. Where no price was fixed in advance, you pay a reasonable price (section 51); where no time was fixed, the work must be done within a reasonable time (section 52). Both are easier to rely on if the contract states the price and the dates in the first place. Section 49 sets the standard for the work itself: it must be done with reasonable care and skill.

Cancelling

The 14-day rules for contracts made at home or online

The cancellation rights in the Consumer Contracts Regulations 2013 apply to contracts made away from the firm's premises, such as at your kitchen table, and to contracts made at a distance, such as online. For a service contract, these are the points that matter most.

Cancellation rules for service contracts made away from the firm's premises or at a distance. Source: Consumer Contracts Regulations 2013 (regulations 28, 30 and 36), read 3 November 2026.
Your situationWhat the rules say
You signed at home, or agreed the job onlineYou can cancel. For a service contract, the cancellation period ends 14 days after the day the contract was made.
You want the work to start inside those 14 daysThe firm must not begin unless you expressly ask it to. For a contract signed at home, the request has to be made on a durable medium, such as paper or email.
You asked for an early start, then cancelledYou pay a proportionate amount for what was supplied before you cancelled.
The firm never told you about your right to cancelIf you cancel, you pay nothing for the service supplied during the cancellation period.
You asked a firm to visit for urgent repairs or maintenanceThere is no right to cancel that visit, except for extra services, or goods beyond the replacement parts the repair needed.

Goods and work together

A heating job usually combines goods, such as a boiler and radiators, with the work of fitting them. Read the cancellation information the firm gives you to see how your 14 days are counted for your particular contract, and keep a copy of it with the quote.

Starting sooner

If you need the work to begin straight away

With no heating in midwinter, 14 days can feel like a long wait. You can ask the firm to begin inside the cancellation period; the rules simply require the request to come from you, expressly, and in a durable form such as paper or email if you signed at home. Keep a copy of what you sent.

Cancel after that and you owe a proportionate amount for whatever had been supplied by then. A visit you specifically asked for because something urgently needed repairing is treated differently: there is no right to cancel it, beyond any extra services, or goods other than the necessary replacement parts.

Banned outright

Sales practices the law bans in all cases

Since 6 April 2025, Schedule 20 of the Digital Markets, Competition and Consumers Act 2024 has listed commercial practices that are banned whatever the circumstances. Several can turn up in heating sales:

  • describing a product as costing nothing when you will in fact pay something towards it (paragraph 23);
  • falsely claiming that a public body or other organisation has approved or endorsed a firm or its offer (paragraph 4);
  • displaying a trust mark, quality mark or similar without authorisation (paragraph 3);
  • fake or misleadingly filtered customer feedback (paragraph 13);
  • falsely suggesting the seller is not acting as a trader (paragraph 25).

Gas law adds an offence of its own: under regulation 3(7) of the Gas Safety (Installation and Use) Regulations 1998, nobody may falsely pretend to be a member of the Gas Safe Register. Meeting any of these is a good reason to walk away.

Finishing well

Write the finish into the contract

The end of a job goes more smoothly when the contract already says what finished means. Name the documents you expect: the Benchmark commissioning checklist, which the Benchmark scheme presents as one way to satisfy Part L's commissioning requirements, and the Building Regulations compliance certificate, which the installer must give you not more than 30 days after completion. The regulations treat that certificate as evidence the work complies, stopping short of conclusive evidence, and the Energy Saving Trust advises keeping building regulations documents for when you sell.

Tie payments to stages of the work rather than paying everything before it starts, and agree what happens if the job overruns or something unexpected is found. The order of a typical replacement, from survey to certificate, is set out on new boiler installation, and boiler installation cost explains the one published price benchmark. When you are ready to compare written quotes, get a heating quote.

Questions about heating contracts and cancelling

When does the 14-day cancellation period end?

For a service contract signed at home or agreed online, the cancellation period under the Consumer Contracts Regulations 2013 ends 14 days after the day the contract was made. Check the cancellation information the firm gave you for how to cancel, and keep a copy of whatever you send.

What happens if I ask for an early start and then cancel?

You owe a proportionate share of the price for what had been supplied by the time you cancelled. If nobody told you that you could cancel, the service supplied during the cancellation period costs you nothing.

Does a promise the salesperson made count if it is not in the quote?

It can. Section 50 of the Consumer Rights Act 2015 makes what a trader says or writes about a service a term of the contract if you took it into account. Keep emails and messages, and write down anything important that was said.

A seller said the boiler would cost me nothing. Is that allowed?

Only if it is true. Describing a product as costing nothing when you have to pay anything towards it is one of the practices banned in all circumstances by Schedule 20 of the Digital Markets, Competition and Consumers Act 2024.

Can I cancel a repair visit I asked for urgently?

Generally not. There is no right to cancel where you specifically asked a firm to visit for urgent repairs or maintenance. The right does apply to extra services, or goods beyond the replacement parts the repair needed.

Where this page's facts come from

Want written quotes you can compare?

Tell us what the job is and what heats the home now. If a firm has already quoted, tell us what the quote includes. We reply by email.

What happens next

  1. Your details go to SEO-DONS LTD, the company behind Heating and Boiler Installation.
  2. We read what you have sent about the house and its heating, and reply by email.
  3. Asking for a quote costs nothing and leaves you free to say no.
Add more about the house and its heating (optional)

Published by SEO Dons Ltd. We don't install boilers ourselves. We reply by email. See our privacy notice.

Get a heating quote
Get a heating quote