Glossary
Heating and boiler terms in plain English
A heating quote can read like another language: interlock, modulation, compensation, unvented. This page translates the terms and points to the page that explains each one.
Last reviewed · facts read at source on 3 November 2026 · published by SEO-DONS LTD · sources
A to Z
Thirty-two terms from quotes, manuals and the rules
Where a definition quotes a rule, the rule is England's. See also the installation rules, comparing heating quotes and the FAQs.
- Approved Documents L, J and G
- England's guidance on the building regulations: L covers fuel and power, J combustion appliances, flues and CO alarms, G hot water safety. L's 2026 edition applies from 24 March 2027.
- Benchmark checklist
- The commissioning record an installer completes when setting up a boiler, on paper or digitally. The Benchmark scheme describes completing it as one way to meet the commissioning requirements of Part L.
- Boiler interlock
- Control wiring that stops the boiler firing when no thermostat is calling for heat; expected with every new boiler.
- BS 7593
- The British Standard for preparing, commissioning and maintaining the water in domestic heating systems; England's guidance applies it when a new boiler goes in.
- Carbon monoxide (CO) alarm
- Required in the room of a new or replacement gas boiler in England: to BS EN 50291-1:2018, with a working-life battery or hard wiring, never a plug.
- Combi (combination) boiler
- Heats the radiators and heats tap water as it runs, so there is no cylinder; the Energy Saving Trust says combis suit smaller households.
- Competent person scheme
- A scheme whose members may certify their own building work instead of notifying the council first. GOV.UK lists eight for heating, including the Gas Safe Register and OFTEC.
- Compliance certificate
- The building regulations certificate for self-certified work, due within 30 days of completion: evidence, though not conclusive evidence, that the work complies.
- Condensate pipe
- The plastic pipe draining water from a condensing boiler to a drain. Insulate any outdoor length, as a frozen one can stop the boiler.
- Condensing boiler
- Wrings extra heat from its exhaust and drains away the water this makes; a plastic flue and a plastic drain pipe are the giveaways.
- Cylinder thermostat
- Tells the controls when the stored water is hot enough; expected whenever a cylinder is replaced.
- ErP efficiency
- A boiler's seasonal heating efficiency under the EU's Energy-related Products rules. A new gas boiler on wet heating in an existing home in England needs 92% or more.
- Flow temperature
- How hot the water leaves the boiler for the radiators. A new or fully replaced system is designed for 55°C or lower.
- Flue
- The pipe taking the boiler's exhaust outside. Approved Document J sets how close its end may be to windows, gutters, corners and boundaries, and warns that a condensing boiler's plume can still bother neighbours.
- Flue gas heat recovery
- Uses heat from the boiler's exhaust to warm the incoming cold water; one of the four combi measures.
- Gas Safe Register
- The register a business must be on to do gas work legally. It replaced CORGI in April 2009, and each engineer carries an ID card.
- Heat loss calculation
- Estimates the heat the house loses in cold weather, which sets the output the boiler needs. From 24 March 2027, copying the old boiler's rating is not appropriate.
- Inhibitor
- A chemical added to the heating water after cleaning to slow corrosion and sludge, as England's guidance requires with a new boiler.
- kW output
- The boiler's heat output in kilowatts, which should follow from the heat loss calculation without significant oversizing.
- Load compensation
- Turns the flow temperature down as rooms near their set temperature; one of the four combi measures.
- Magnetic filter
- Catches magnetic sludge in the circulating water. The Energy Saving Trust says an installer replacing a boiler should fit one if none is there.
- Modulation
- How far a boiler can throttle back and run gently instead of cycling on and off; a combi should turn down to the home's typical heating load.
- Regular (heat-only) boiler
- Heats the radiators and a separate cylinder, usually with loft tanks; the Energy Saving Trust says it is unlikely to suit a flat.
- Room thermostat
- Holds one room at your setting by switching the heating; paired with TRVs elsewhere, it is one way to control each room.
- SEDBUK
- An older UK efficiency rating. England's guidance accepts SEDBUK 2009 figures of 78% for natural gas or 80% for LPG only in exceptional circumstances.
- Smart thermostat with automation and optimisation
- Runs the heating to a schedule by itself and works out when to start; only this kind counts as a combi measure.
- System boiler
- Heats a stored cylinder, with the pump and other parts built in; the Energy Saving Trust links it with bigger hot water demand.
- TRV (thermostatic radiator valve)
- A radiator valve that throttles the hot water as its room warms to the chosen setting, giving that room its own control.
- Unvented cylinder
- A sealed cylinder supplied by the mains, so taps run at mains pressure with no loft tank. Fitting one is notifiable.
- Vented cylinder
- Fed by a cold water tank above it, usually in the loft, with an open vent pipe; the tank's height sets the pressure.
- Weather compensation
- Links the boiler to an outdoor sensor: the milder the weather, the cooler the water it sends to the radiators. One of the four combi measures.
- Wet work
- Pipes and radiators: work HSE says a plumber not on the Gas Safe Register may do, unlike the boiler and its final water connection.
A word on your quote that isn't here?
Ask the installer to explain it in writing before you sign, or get a heating quote to compare the whole job.
Where this page's facts come from
- GOV.UK — Approved Document L, Volume 1: dwellings, 2021 edition incorporating 2023 amendments (PDF) read 3 November 2026
- GOV.UK — Approved Document L, 2026 edition (applies from 24 March 2027) read 3 November 2026
- GOV.UK — Approved Document J, 2022 amendments (PDF) read 3 November 2026
- GOV.UK — Approved Document G, with 2024 amendments (PDF) read 3 November 2026
- HSE — the Gas Safe Register and the engineer ID card read 3 November 2026
- HSE — who can do gas work, and the limits of "wet work" read 3 November 2026
- legislation.gov.uk — Building Regulations 2010, regulation 20 (compliance certificates) read 3 November 2026
- GOV.UK — competent person schemes: current schemes read 3 November 2026
- Benchmark — the commissioning checklist scheme read 3 November 2026
- Energy Saving Trust — boilers (secondary source) read 3 November 2026
- Which? — common boiler problems and repair costs (secondary source) read 3 November 2026
A quote full of terms like these?
Tell us what the job covers, or copy in the lines from a quote you already hold, and say what you would like priced. We reply by email.
What happens next
- Your details go to SEO-DONS LTD, the company behind Heating and Boiler Installation.
- We read what you have sent about the house and its heating, and reply by email.
- Asking for a quote costs nothing and leaves you free to say no.